COMPARE
One requirement.
Different supply approaches.
Compare gas quality, use-point pressure, continuity and costs on the same basis before choosing cylinders, liquid supply or on-site generation.
| Topic | Cylinders / bundles | Liquid supply | On-site generation |
|---|---|---|---|
| Supply arrangement | Delivered containers and changeovers | Storage, vaporization and tanker delivery | Production from air using site utilities |
| Questions to review | Delivery frequency, changeover and storage | Tank siting, vehicle access, rental and losses | Energy, quality, load matching and backup |
| Cost boundary | Gas, transport, container rental and handling | Gas, tank, vaporization, distribution and losses | Installed equipment, power, maintenance and backup |
| Continuity planning | Inventory and changeover strategy | Stock monitoring and delivery scheduling | Equipment condition and reserve supply |
| Common acceptance point | Required quality and pressure at the process | Required quality and pressure at the process | Required quality and pressure at the process |
This is a comparison framework with no predetermined winner. The economics depend on real demand, gas quality, operating hours, installation scope and local prices.
Compare your own assumptions →