AIDEKEGAS ENGINEERING
Energy and cost analysis / CONFIGURATION

Nitrogen and oxygen metering

Use consistent gas and electricity boundaries for selection and operating decisions.

Configuration guide for initial discussion. Final models, capacity, dimensions and supply boundaries depend on the confirmed project conditions.
AIDEKE / SYSTEM STUDY 48+Nitrogen and oxygen metering — manufacturer equipment reference photoManufacturer reference photo · sjjq.com

01Define the operating duty

Specify actual volume, reference-condition volume or mass flow, with reference conditions in every report. Select around minimum, normal and peak demand. A peak-only range may fail to identify small overnight consumption.

  • Demand input: Units and reference conditions

02Connect the complete system

Check gas compatibility, pressure, temperature, straight runs and compensation. To evaluate generation cost, measure total station electricity and qualified gas consistently. Off-specification startup discharge should not be counted as useful production.

  • Interface input: Flow range; Installation conditions

03Verify the configuration

Check agreement of instantaneous flow, cumulative volume and timestamps in real operation. Include maintenance, spare parts and backup gas in costs. Metering provides evidence; nameplate motor power alone cannot establish actual unit supply cost.

This topic describes station auxiliaries. Confirm compatibility, quantities and supply boundaries against the system diagram. The fields below collect project requirements and do not represent a fixed model rating.

  • Verification input: Electricity and product-gas boundaries

Selection conditions to confirm

ItemRequirement / confirmation basis
Units and reference conditionsConfirm for the projectProvide actual process conditions and the measurement basis.
Flow rangeConfirm for the projectSpecify normal values, peaks or the permitted range.
Installation conditionsConfirm for the projectCheck against existing equipment and site conditions.
Electricity and product-gas boundariesConfirm for the projectAgree the acceptance basis during technical review.
References

These public references explain general technology. They do not establish AIDEKE model performance, a supply commitment or a third-party endorsement. The article is an independent editorial explanation; the confirmed technical agreement governs a specific project.

Sources and usage notes

Turn your gas requirements
into a clear next step.

Start with quality, flow and pressure. We will help organize the right questions for your site.

Talk to AIDEKE ↗
↗ +86 159 2118 5440