Different loss categories need different corrective actions.

01Define intentional streams

Startup rejection, quality-controlled venting and analyser sampling may be designed functions. Record their purpose, timing and estimated or measured quantities separately. Labeling every non-product stream as a leak obscures how the station actually operates.

02Locate unintended losses

Compare generation and delivery measurements where their accuracy and reference conditions allow it. Investigate unexplained differences with suitable detection methods. Consider storage pressure changes over the interval before interpreting a temporary imbalance as continuous leakage.

03Prioritize without weakening safeguards

Repeated off-specification discharge may call for a quality or control investigation; excessive sample use may call for an approved sampling review. Do not disable quality diversion or protective functions to improve a gas-balance number. Verify improvements against both useful output and the required gas quality.

Apply this guidance with the equipment manual, actual site conditions and applicable requirements. Design, operation and maintenance decisions need appropriately qualified personnel. Confirmed product documents govern a specific equipment supply.
References

These public references explain general technology. They do not establish AIDEKE model performance, a supply commitment or a third-party endorsement. The article is an independent editorial explanation; the confirmed technical agreement governs a specific project.

Sources and usage notes

Turn your gas requirements
into a clear next step.

Start with quality, flow and pressure. We will help organize the right questions for your site.

Talk to AIDEKE ↗
↗ +86 159 2118 5440