Select gas pressure from the critical use point

Work back through distribution losses before setting a generator pressure.

01Identify the limiting connection

Record the pressure the process needs while gas is flowing, not only a static gauge reading. Locate the most demanding branch and the longest or most restricted route. Note whether the requirement uses gauge or absolute pressure.

02Build the pressure budget

Include regulators, filters, hoses, valves, storage and pipework in the route. Their losses depend on actual flow and operating conditions. If a high-pressure step is required, assess the booster as a separate duty with its own capacity and gas-service requirements.

03Verify before increasing pressure

Synchronized upstream and downstream readings during the peak can show whether the problem is a restrictive network or insufficient supply. Raising the entire station pressure may increase energy use without correcting a poorly sized final connection. Confirm changes against equipment limits and the approved design.

Apply this guidance with the equipment manual, actual site conditions and applicable requirements. Design, operation and maintenance decisions need appropriately qualified personnel. Confirmed product documents govern a specific equipment supply.
References

These public references explain general technology. They do not establish AIDEKE model performance, a supply commitment or a third-party endorsement. The article is an independent editorial explanation; the confirmed technical agreement governs a specific project.

Sources and usage notes

Turn your gas requirements
into a clear next step.

Start with quality, flow and pressure. We will help organize the right questions for your site.

Talk to AIDEKE ↗
↗ +86 159 2118 5440